DAQUAE
// Business line 02 · Manufacturer & engineering office

Water & equipment

DAQUAE designs, manufactures, installs and maintains water purification, storage, sanitation and drilling equipment, designed specifically for Africa. Our sub-assemblies are pre-built in France using French, Swiss, British, German and Dutch technologies, to WHO and French standards.

We also supply all hydraulic equipment for drinking water, industrial water, wastewater and swimming pools.

150 m³/hmaximum capacity of a POTASOL container
0.01 µmmembrane ultrafiltration
300 m³steel water tower, erected in 20 days
500 PEDBIODISK wastewater micro-plant
Supply

All hydraulic equipment

Beyond our own equipment, DAQUAE supplies all the hydraulic equipment for your projects: pumps, booster sets, filters, valves, pipework, fittings, instrumentation, control panels and spare parts.

Drinking water

Abstraction, pumping, treatment, storage and distribution.

Industrial water

Softening, filtration, reverse osmosis, process water.

Wastewater

Lifting, treatment, reuse of treated water.

Swimming pools

Filtration, pumps, water treatment and disinfection.

Catalogue

Community water purification

From villages to cities: automatic purification of borehole, surface, rain and mains water, with solar autonomy available.

Water purification container
POTASOL

Water purification container

Ready-to-install 10 or 20-foot container for villages, schools, hospitals, hotels, base camps and refugee camps. Regulated 0.01 µm ultrafiltration or UVc, with no reagent other than chlorine.

  • 5 to 150 m³/h depending on model
  • Integrated 8 m³ storage
  • Solar autonomy or battery backup
  • Automatic coupling to the DCE water tower
DAQUAE DP3UF ultrafiltration plant
DP3UF

Ultrafiltration plant

Automatic plant installed at a building's water inlet (mains, borehole, rainwater or tank). No chemicals, 0.01 µm membranes, made in France.

  • 1,000, 2,000 or 3,000 L/h (DP3000/2, /4, /6)
  • 2, 4 or 6 membranes of 0.01 µm
  • Automatic timer-controlled backwash
  • Service life of 7 to 10 years
Water purification 30 m³/day
BUILDING PACK

Water purification 30 m³/day

For villas, schools, public offices and clinics. Security Pack (double filtration + chlorination without electricity) or Performance Pack with 0.01 µm ultrafiltration, to WHO or French standards.

  • 3 m³/h, i.e. 30 m³/day
  • Chlorine and level alarm
  • UVc steriliser option
  • Multilayer sand filter option

DP3UF in detail

Panel of the DP3UF ultrafiltration plant

Fully automated, autonomous membrane ultrafiltration of mains, borehole, rain and tank water (maximum 4 bar and 35 °C). Robust design, made in France. The plant is installed indoors at the main water inlet, for houses, hospitals, clinics and hotels connected to a network, a well or a tank that may present bacterial contamination and suspended solids.

A 130 µm pre-filter protects the membranes, whose 0.01 µm pores retain suspended solids, bacteria, protozoa and pathogens. The water must be clear, non-brackish and under pressure; pre-filtration is required for river and lake water.

Advantages

  • No chemicals: reliable, instant treatment.
  • Polysulfone hollow-fibre membranes.
  • Outside-in dead-end filtration: low water loss, large filtration surface, extended service life.
  • Very low consumption: no electricity is consumed during production. A timer automatically triggers the membrane backwash.

Technical specifications

ModelDP3000/2DP3000/4DP3000/6
Capacity1,000 L/h2,000 L/h3,000 L/h
Membranes246
TypeAutonomous water purification plant
TechnologyOutside-in dead-end filtration, 0.01 µm
Service life7 to 10 years depending on maintenance
ConnectionPressure of 2 to 4 bar; 220 V single-phase, 50 Hz, 16 A (consumption for solenoid valves only)

Capacity decreases with turbid water. Option: cyclonic filtration kit, which pre-filters turbid water.

Request a quotation

Storage, sanitation and drilling

Steel water tower
DCE

Steel water tower

Galvanised steel water tower prefabricated in Europe, assembled by bolting, with a one-piece liner meeting drinking water standards. 24-hour solar kit and automation kit available as options.

  • 15 to 300 m³
  • Tower of 5, 10 or 15 m (20 m on request)
  • Structure erected in 8 to 20 days
  • DN100 to DN150 distribution
Wastewater micro-plant
DBIODISK

Wastewater micro-plant

All-in-one compact plant: settling tank, biodisc reactor, clarifier and sludge storage. A single motor, no chemical reagents, suited to intermittent use.

  • 10 to 75 m³/day
  • 70 to 500 PE (up to 1,900 PE on WHO basis)
  • BOD5 < 25 mg/l, COD < 125 mg/l
  • 0.97 to 1.35 kW, solar available
Study, drilling, pump
DRILLING & PUMPING

Study, drilling, pump

Preliminary geological study, drilling, pumping tests and analyses. Grundfos submersible pumps, DAQUAE protection and control panel, autonomous solar pumping.

  • Pump selection according to total head
  • Protection against dry running and overheating
  • Control and variable speed drive
  • Automatic solar pumping

Solar energy

Collective solar thermal
DTHERM PRO

Collective solar thermal

Domestic hot water for hotels and collective buildings, a dual-circuit system with automatic refill designed for hot countries. Example: 4-star hotel in Togo, 12 panels and 2 tanks of 1 m³.

  • 1.91 m² panels
  • 500 or 1,000 L enamelled tanks
  • Backup electric heater
Solar pumping on trackers in Madzia, Congo
Solar pumping

Solar pumping on trackers

Reference: Madzia, Congo. Photovoltaic array on adjustable trackers powering a water pumping station. Galvanised steel structures on concrete footings.

View the reference
Completed project

Steel water towers in kit form

Delivered in containers, assembled by bolting and lifted by crane: a DCE water tower is erected in 8 to 20 days depending on its capacity, with no concrete poured at height.

  1. Foundations
    Foundations
    FoundationsConcrete footings for the tower legs.
  2. Tower assembly
    Tower assembly
    Tower assemblyGalvanised components bolted together at ground level.
  3. Decking
    Decking
    DeckingTank support platform.
  4. Tank erection
    Tank erection
    Tank erectionGalvanised steel shell rings and liner.
  5. Lifting
    Lifting
    LiftingPositioning of the assembly by crane.
  6. Water tower in service
    Water tower in service
    CommissioningShown here: a 90 m³ drinking water tower.
Completed project

Water treatment for an airport central kitchen

An airline catering central kitchen requires impeccable water and constant pressure. DAQUAE designed, supplied and installed the complete treatment train on a turnkey basis.

  • Pre-filtration and filtration
  • Softening
  • 0.01 µm membrane ultrafiltration
  • Chlorination by dosing pump
  • Storage tank and booster set
  • Electrical panel and automatic control
Treatment room: storage, filtration, booster set
Treatment room: storage, filtration, booster set

Our installations

Our services around the equipment

The DAQUAE engineering office sizes your treatment train based on an analysis of the raw water; our teams then install and maintain the sites.

Before

Water analysis, consulting, feasibility studies, solar pumping simulation.

During

Manufacture, delivery, installation and turnkey commissioning.

After

Operator training, maintenance, spare parts stock, audit.

A project to launch quickly?

Request a study